Oil Field Site Development
Site preparation and infrastructure development for major oil field operations in the Niger Delta.

Client
Major Oil & Gas Operator
Location
Niger Delta Region
Duration
12 months
Project Overview
DOCOMO Technologies Limited executed comprehensive site development and infrastructure works for a major oil field operation in the Niger Delta. The project included land clearing, access road construction, equipment pad preparation, drainage systems, and installation of temporary facilities to support drilling and production operations.
Challenges
- •Working in environmentally sensitive swamp and mangrove areas
- •Ensuring compliance with strict environmental regulations
- •Managing logistics in remote locations with limited access
- •Maintaining safety standards in hazardous oil field environment
Our Solutions
- ✓Employed specialized swamp equipment and constructed temporary access platforms
- ✓Implemented comprehensive Environmental Management Plan with continuous monitoring
- ✓Established forward logistics base and utilized marine transport for equipment and materials
- ✓Rigorous HSE training for all personnel and strict adherence to oil industry safety protocols
Results
Project Impact
The project enabled the client to commence drilling operations ahead of schedule, resulting in significant cost savings. Our environmental management approach ensured zero environmental incidents, and the infrastructure continues to support ongoing field operations reliably.
Interested in a Similar Project?
Contact DOCOMO Technologies Limited today to discuss how we can deliver exceptional results for your civil engineering and construction needs.
Contact Us