Docomo Technologies LogoDOCOMO TECHNOLOGIES

Commercial Building Complex

Multi-story commercial complex with comprehensive electrical and structural engineering in Owerri.

Commercial Building Complex

Client

Private Commercial Developer

Location

Owerri, Imo State

Duration

18 months

Project Overview

DOCOMO Technologies Limited provided comprehensive building construction, structural engineering, and electrical installation services for a modern 4-story commercial complex in Owerri. The 5,000 square meter development includes retail spaces on the ground floor and office suites on upper floors, with full electrical systems, backup power, and modern amenities.

Challenges

  • Complex architectural design requiring precise structural engineering
  • Coordinating multiple specialized trades and subcontractors
  • Ensuring uninterrupted power supply through reliable backup systems
  • Meeting tight deadlines for tenant move-in commitments

Our Solutions

  • Detailed structural analysis and use of reinforced concrete frame construction
  • Implemented comprehensive project management system with weekly coordination meetings
  • Installed 250KVA generator with automatic changeover system and UPS for critical loads
  • Fast-track construction methodology with parallel work streams

Results

5,000m²
Total Floor Area
4 Floors
Stories Completed
100%
Occupancy Rate

Project Impact

The completed complex has become a landmark commercial building in Owerri, attracting premium tenants and achieving full occupancy within three months of completion. The building's modern electrical infrastructure and reliable power systems have been particularly praised by tenants.

Interested in a Similar Project?

Contact DOCOMO Technologies Limited today to discuss how we can deliver exceptional results for your civil engineering and construction needs.

Contact Us